Acmhainní agus Earraí Áisiúla le hÍoslódáil No.2
Bileog Eolais (5MB)
Bileog Eolais (5MB)
Public Consultation No. 2 Leaflet for the DART+ South West Project
DART+ South West Brochure (30MB)
DART+ South West Brochure (30MB)
Public Consultation No. 2 Brochure for the DART+ South West Project
Option Selection Report Volume 1 - Preferred Option (7MB)
Option Selection Report Volume 1 - Preferred Option (7MB)
Public Consultation No. 2 Option Selection Report: Volume 1 - Preferred Option Report for the DART+ South West Project
Annex 1.0 - Schematic layout combined set (15MB)
Annex 1.0 - Schematic layout combined set (15MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout - Key plan (5MB)
Schematic layout - Key plan (5MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout sheet 1 of 17 - Hazelhatch (Limit of DART+ South West Project) (344KB)
Schematic layout sheet 1 of 17 - Hazelhatch (Limit of DART+ South West Project) (344KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout sheet 2 of 17 - Hazelhatch Station and surrounds (405KB)
Schematic layout sheet 2 of 17 - Hazelhatch Station and surrounds (405KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout sheet 3 of 17 - West of Tubber Lane (340KB)
Schematic layout sheet 3 of 17 - West of Tubber Lane (340KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout sheet 4 of 17 - Stacummy Lane and surrounds (350KB)
Schematic layout sheet 4 of 17 - Stacummy Lane and surrounds (350KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout sheet 5 of 17 - Adamstown Station and surrounds (400KB)
Schematic layout sheet 5 of 17 - Adamstown Station and surrounds (400KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout sheet 6 of 17 - Adamstown to Grifeen Valley Park and surrounds (620KB)
Schematic layout sheet 6 of 17 - Adamstown to Grifeen Valley Park and surrounds (620KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout sheet 7 of 17 - Tullyhall and Kishoge Station (515KB)
Schematic layout sheet 7 of 17 - Tullyhall and Kishoge Station (515KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout sheet 8 of 17 - Clondalkin / Fonthill Station (482KB)
Schematic layout sheet 8 of 17 - Clondalkin / Fonthill Station (482KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout sheet 9 of 17 - Ninth Lock Road and Coverhill Road (817KB)
Schematic layout sheet 9 of 17 - Ninth Lock Road and Coverhill Road (817KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout sheet 10 of 17 - M50 and Park West (708KB)
Schematic layout sheet 10 of 17 - M50 and Park West (708KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout sheet 11 of 17 - Cherry Orchard to Kylemore Road Bridge (892KB)
Schematic layout sheet 11 of 17 - Cherry Orchard to Kylemore Road Bridge (892KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout sheet 12 of 17 - Kylemore to Inchicore Works (1.2MB)
Schematic layout sheet 12 of 17 - Kylemore to Inchicore Works (1.2MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout sheet 13 of 17 - Sarsfield Road to South Circular Road (1.1MB)
Schematic layout sheet 13 of 17 - Sarsfield Road to South Circular Road (1.1MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout sheet 14 of 17 - St Johns Road to Phoenix Park Tunnel (including Heuston Station) (980KB)
Schematic layout sheet 14 of 17 - St Johns Road to Phoenix Park Tunnel (including Heuston Station) (980KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout sheet 15 of 17 - Phoenix Park to McKee Barracks Bridge (956KB)
Schematic layout sheet 15 of 17 - Phoenix Park to McKee Barracks Bridge (956KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout sheet 16 of 17 - Blackhorse Avenue to Cabra Road (958KB)
Schematic layout sheet 16 of 17 - Blackhorse Avenue to Cabra Road (958KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Schematic layout sheet 17 of 17 - Cabra to Glasnevin Junction (1MB)
Schematic layout sheet 17 of 17 - Cabra to Glasnevin Junction (1MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Volume 3A – Technical Optioneering Report - Hazelhatch to Park West (9MB)
Volume 3A – Technical Optioneering Report - Hazelhatch to Park West (9MB)
Technical report to support the Option Selection Report for the DART+ South West Project, provinding details of the setting and options for this particular area.
Vol 3A – Appendix A.1: Sifting process backup - Hazelhatch to Park West corridor (57KB)
Vol 3A – Appendix A.1: Sifting process backup - Hazelhatch to Park West corridor (57KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3A – Appendix A.2: Sifting process backup - Substation site location (79KB)
Vol 3A – Appendix A.2: Sifting process backup - Substation site location (79KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3A – Appendix B.1: MCA process backup - Substation site location (642KB)
Vol 3A – Appendix B.1: MCA process backup - Substation site location (642KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3A – Appendix C: Supporting drawings (10MB)
Vol 3A – Appendix C: Supporting drawings (10MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Volume 3B – Technical Optioneering Report - Park West to Le Fanu Bridge (10MB)
Volume 3B – Technical Optioneering Report - Park West to Le Fanu Bridge (10MB)
Technical report to support the Option Selection Report for the DART+ South West Project, provinding details of the setting and options for this particular area.
Vol 3B – Appendix A.1: Sifting process backup - Park West to Le Fanu Road Bridge corridor (135KB)
Vol 3B – Appendix A.1: Sifting process backup - Park West to Le Fanu Road Bridge corridor (135KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3B – Appendix A.2: Sifting process backup - Construction compounds location (67KB)
Vol 3B – Appendix A.2: Sifting process backup - Construction compounds location (67KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3B – Appendix B.1: MCA process backup - Park West to Le Fanu Road Bridge corridor (472KB)
Vol 3B – Appendix B.1: MCA process backup - Park West to Le Fanu Road Bridge corridor (472KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3B – Appendix C: Supporting drawings (7MB)
Vol 3B – Appendix C: Supporting drawings (7MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Volume 3C - Technical Optioneering Report - Le Fanu Bridge to Kylemore Bridge (8MB)
Volume 3C - Technical Optioneering Report - Le Fanu Bridge to Kylemore Bridge (8MB)
Technical report to support the Option Selection Report for the DART+ South West Project, providing details of the setting and options for this particular area.
Vol 3C – Appendix A1: Sifting process backup - Le Fanu Bridge to Kylemore Bridge corridor (83KB)
Vol 3C – Appendix A1: Sifting process backup - Le Fanu Bridge to Kylemore Bridge corridor (83KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3C – Appendix A2: Sifting process backup - Substation site location (60KB)
Vol 3C – Appendix A2: Sifting process backup - Substation site location (60KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3C – Appendix B1: MCA process backup - Le Fanu Bridge to Kylemore Bridge corridor (90KB)
Vol 3C – Appendix B1: MCA process backup - Le Fanu Bridge to Kylemore Bridge corridor (90KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3C – Appendix C: Supporting drawings (8MB)
Vol 3C – Appendix C: Supporting drawings (8MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Volume 3D – Technical Optioneering Report - Kylemore Bridge to Sarsfield Road (13MB)
Volume 3D – Technical Optioneering Report - Kylemore Bridge to Sarsfield Road (13MB)
Technical report to support the Option Selection Report for the DART+ South West Project, provinding details of the setting and options for this particular area.
Vol 3D – Appendix A.1: Sifting process backup - Inchicore (67KB)
Vol 3D – Appendix A.1: Sifting process backup - Inchicore (67KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3D – Appendix A.2: Sifting process backup - Khyber Pass Footbridge (63KB)
Vol 3D – Appendix A.2: Sifting process backup - Khyber Pass Footbridge (63KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3D – Appendix B: MCA Process Back Up (472KB)
Vol 3D – Appendix B: MCA Process Back Up (472KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3D – Appendix C: Supporting Drawings (10MB)
Vol 3D – Appendix C: Supporting Drawings (10MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Volume 3E – Technical Optioneering Report - Sarsfield to Memorial Road (10MB)
Volume 3E – Technical Optioneering Report - Sarsfield to Memorial Road (10MB)
Technical report to support the Option Selection Report for the DART+ South West Project, provinding details of the setting and options for this particular area.
Vol 3E – Appendix A: Sifting process backup - Sarsfield Road to Memorial Road corridor (96KB)
Vol 3E – Appendix A: Sifting process backup - Sarsfield Road to Memorial Road corridor (96KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3E – Appendix B: Supporting drawings (8MB)
Vol 3E – Appendix B: Supporting drawings (8MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Volume 3F – Technical Optioneering Report - Memorial Road (7MB)
Volume 3F – Technical Optioneering Report - Memorial Road (7MB)
Technical report to support the Option Selection Report for the DART+ South West Project, providing details of the setting and options for this particular area.
Vol 3F – Appendix A.1: Sifting process backup - Memorial Road Bridge (70KB)
Vol 3F – Appendix A.1: Sifting process backup - Memorial Road Bridge (70KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3F – Appendix B.1: MCA process backup - Civil and OHLE at Memorial Road area (92KB)
Vol 3F – Appendix B.1: MCA process backup - Civil and OHLE at Memorial Road area (92KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3F – Appendix C: Supporting drawings (8MB)
Vol 3F – Appendix C: Supporting drawings (8MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Volume 3G – Technical Optioneering Report - South Circular Road Junction to East of St John's Road Bridge (8MB)
Volume 3G – Technical Optioneering Report - South Circular Road Junction to East of St John's Road Bridge (8MB)
Technical report to support the Option Selection Report for the DART+ South West Project, providing details of the setting and options for this particular area.
Vol 3G – Appendix A.1: Sifting process backup - Memorial Road to South Circular Road Junction (96KB)
Vol 3G – Appendix A.1: Sifting process backup - Memorial Road to South Circular Road Junction (96KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3G – Appendix B.1: MCA process backup - Memorial Road to South Circular Road Junction (560KB)
Vol 3G – Appendix B.1: MCA process backup - Memorial Road to South Circular Road Junction (560KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3G – Appendix C: Supporting drawings (14MB)
Vol 3G – Appendix C: Supporting drawings (14MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Volume 3H – Technical Optioneering Report - Heuston Station and Yard (4MB)
Volume 3H – Technical Optioneering Report - Heuston Station and Yard (4MB)
Technical report to support the Option Selection Report for the DART+ South West Project, providing details of the setting and options for this particular area.
Vol 3H – Appendix A.1: Sifting process backup - Heuston Station and Yard (85KB)
Vol 3H – Appendix A.1: Sifting process backup - Heuston Station and Yard (85KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3H – Appendix B: Supporting drawings (7MB)
Vol 3H – Appendix B: Supporting drawings (7MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Volume 3I - Technical Optioneering Report - Heuston West Station (8MB)
Volume 3I - Technical Optioneering Report - Heuston West Station (8MB)
Technical report to support the Option Selection Report for the DART+ South West Project, providing details of the setting and options for this particular area.
Vol 3I - Appendix A.1: Sifting process backup - Heuston West Station (429KB)on (429KB)
Vol 3I - Appendix A.1: Sifting process backup - Heuston West Station (429KB)on (429KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3I – Appendix B.1 - MCA Process Backup - Heuston West (92KB)
Vol 3I – Appendix B.1 - MCA Process Backup - Heuston West (92KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3I – Appendix C: Supporting drawings (12MB)
Vol 3I – Appendix C: Supporting drawings (12MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Volume 3J – Technical Optioneering Report - East of St. John's Road Bridge (Islandbridge) to North of the Phoenix Park Tunnel (7MB)
Volume 3J – Technical Optioneering Report - East of St. John's Road Bridge (Islandbridge) to North of the Phoenix Park Tunnel (7MB)
Technical report to support the Option Selection Report for the DART+ South West Project, providing details of the setting and options for this particular area.
Vol 3J – Appendix A.1: Sifting process backup - Conyngham Road Bridge and Phoenix Park Tunnel (547KB)
Vol 3J – Appendix A.1: Sifting process backup - Conyngham Road Bridge and Phoenix Park Tunnel (547KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3J – Appendix A.2: Sifting process backup - Substation site location (102KB)
Vol 3J – Appendix A.2: Sifting process backup - Substation site location (102KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3J – Appendix B.1: MCA process backup - Substation site location (153KB)
Vol 3J – Appendix B.1: MCA process backup - Substation site location (153KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3J – Appendix C: Supporting drawings (7MB)
Vol 3J – Appendix C: Supporting drawings (7MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Volume 3K - Technical Optioneering Report - North of the Phoenix Park Tunnel to Glasnevin Junction (9MB)
Volume 3K - Technical Optioneering Report - North of the Phoenix Park Tunnel to Glasnevin Junction (9MB)
Technical report to support the Option Selection Report for the DART+ South West Project, providing details of the setting and options for this particular area.
Vol 3K - Appendix A .1: Sifting process backup - Corridor bridges (483KB)
Vol 3K - Appendix A .1: Sifting process backup - Corridor bridges (483KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Vol 3K – Appendix B: Supporting drawings (12MB)
Vol 3K – Appendix B: Supporting drawings (12MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Volume 4.1 – Public Consultation No. 1 - Consultation Findings Report (18MB)
Volume 4.1 – Public Consultation No. 1 - Consultation Findings Report (18MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Volume 4.2 – Option Selection - Policy Context (3MB)
Volume 4.2 – Option Selection - Policy Context (3MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Volume 4.3 – Option Selection - Strategic Need (2MB)
Volume 4.3 – Option Selection - Strategic Need (2MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Appendix A: DART Expansion Programme Options Assessment (Aug 2018) (28MB)
Appendix A: DART Expansion Programme Options Assessment (Aug 2018) (28MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Appendix B: DART Expansion Programme Options Assessment Addendum (June 2019) (2MB)
Appendix B: DART Expansion Programme Options Assessment Addendum (June 2019) (2MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Appendix C:DART Expansion Future Patronage Modelling Report (June 2020) (6MB)
Appendix C:DART Expansion Future Patronage Modelling Report (June 2020) (6MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Appendix D: DART Underground Western Tie In Study (2016) (38MB)
Appendix D: DART Underground Western Tie In Study (2016) (38MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Appendix E:DART Expansion Feasibility Four tracking to PPT (Dec 2018) (ARUP, 2018). (4MB)
Appendix E:DART Expansion Feasibility Four tracking to PPT (Dec 2018) (ARUP, 2018). (4MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Volume 4.4 – Option Selection - Constraints Report (2MB)
Volume 4.4 – Option Selection - Constraints Report (2MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Appendix A: Planning Application Monitor (9MB)
Appendix A: Planning Application Monitor (9MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Appendix B: Heritage Memo (2MB)
Appendix B: Heritage Memo (2MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Appendix C: Constraints Mapping - Population Constraints (6MB)
Appendix C: Constraints Mapping - Population Constraints (6MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Appendix D: Constraints Mapping - My Plan Zones (2MB)
Appendix D: Constraints Mapping - My Plan Zones (2MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Appendix E: Constraints Mapping - Round 3 Rail Noise Lden (3MB)
Appendix E: Constraints Mapping - Round 3 Rail Noise Lden (3MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Appendix F: Constraints Mapping - Biodiversity Constraints (2MB)
Appendix F: Constraints Mapping - Biodiversity Constraints (2MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Appendix G: Constraints Mapping - Landscape Constraints (2MB)
Appendix G: Constraints Mapping - Landscape Constraints (2MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Appendix H: Constraints Mapping - Cultural Heritage Constraints (2MB)
Appendix H: Constraints Mapping - Cultural Heritage Constraints (2MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Appendix I: Constraints Mapping - Soils and Geology Constraints (7MB)
Appendix I: Constraints Mapping - Soils and Geology Constraints (7MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Appendix J: Constraints Mapping - Hydrogeology Constraints (6MB)
Appendix J: Constraints Mapping - Hydrogeology Constraints (6MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Appendix K: Constraints Mapping - Key Utilities and Licensed Facilities (10MB)
Appendix K: Constraints Mapping - Key Utilities and Licensed Facilities (10MB)
Information provided to support the Option Selection Report for the DART+ South West Project
Annex 4.5 – Option Selection - Useful Links (649KB)
Annex 4.5 – Option Selection - Useful Links (649KB)
Information provided to support the Option Selection Report for the DART+ South West Project
Urraitheoirí
The DART+ Programme is being implemented by Iarnród Éireann as part of Project Ireland 2040 and the NTA's Transport Strategy for the Greater Dublin Area (2016-2035).